Specification
Details
Safety distance
We recommend the inverter around have a minimum clearance, so that better to heat dissipation and wiring operation, as shown below:
LS 3000H/LS 4000H/LS 5000H/LS 3000HD Install the inverter onto the bracket
/LS 4000HD/LS 5000HD support bracket
Fix safety nut
Testing
Working Line
Application
Company Show
International Exhibition
Packing
FAQ:
1:What current the SL7-63 can be ?
From 1-63A ,6/10/16/20/25/32/40/50/63A is more common .
2:What is SL7-63 test standard ?
IEC 60947-1
3:What size of your 1 pole SL7-63 ?
The size is 17.5*80*71 mm ,2/3/4 poles multiply 2/3/4 times .
4:How long does your SUP2-PV response time ?
The response time is shorter than 25 nanosecond .
5: How can I know the combiner box working status ?
Our combiner box can use monitoring module and show each part status .